Books
Global Claims in Construction by Ali Haidar; Hardcover
ISBN 978-0-85729-729-7
Publishers: Springer Vertag - 2011
Global Claims in Construction addresses the principles of global claims and their calculation methodologies in detail through extensive references to literature, case law and a real
world case study. It aims to be a valuable resource for professionals working in the construction industry, as well as students in construction and engineering.
Delay and Disruption Claims in Construction by Ali Haidar and Peter Barnes; Hardbound
ISBN:978-0-7277-5705-0
Publisher: ICE Publishing Ltd. First Edition - 2011
Second Edition – ISBN: 978-0-7277-4087-8 - 2014
Delay and Disruption Claims in Construction is an internationally-applicable, practical resource that guides professionals through every
type and aspect of delay and disruption claims. Drawing on their experience, the authors outline a practical approach to the presentation
of delay and disruption claims in construction within a legal, contractual and technical framework. Detailed case studies are used to describe
the different problems that can be encountered and explain the more dynamic approach to the settlement of claims, often taken in the
international market, to help reduce the time and cost of legal proceedings.
Programme Management in Construction by Ali Haidar, Peter Barnes, Roy Farren and Kenneth Wells. HarboundISBN-10: 0727760149; ISBN-13: 978-0727760142; Publisher: ICE Publishing Ltd. December 2014
Program Management in Construction introduces the application of program management to professionals in the construction industry through demonstrating how program management techniques could have been applied for a more optimal outcome in a real-life example. Encompassing the different activities of a program pre-design feasibility and master plan, design (including BIM), contracts and bill of quantities formation, qualification and appointment of contractor(s), supervision and control of the works, handover and facilities management, this book explains how program managers can successfully manage programs. This book is a leading reference on the new development of programme management which is the new way to manage many projects being constructed as a program.Papers
1. Haidar, A. and Naoum, S.
"A Hybrid Knowledge Base System and Genetic Algorithms for Equipment Selection"
Journal of Engineering, Construction and Architectural Management Vol. 7, No. 1, March 2000, PP 3-14.
Journal of Engineering, Construction and Architectural Management Vol. 7, No. 1, March 2000, PP 3-14.
2. Haidar, A. and Naoum, S.
"Opencast Mine Equipment Selection Using Genetic Algorithms."
International Journal of Surface Mining, Reclamation and Environment, Vol.10, July 1996, PP 61-67.
International Journal of Surface Mining, Reclamation and Environment, Vol.10, July 1996, PP 61-67.
3. Haidar, A., Naoum, S., Howes, R. and Tah, J.
"Equipment Selection in Opencast Mining Using Intelligent Based Genetic Alogrithm"
ASCE, Jr. of Construction Engineering and Management. 1996.
ASCE, Jr. of Construction Engineering and Management. 1996.
4. Haidar, A. and Naoum, S.
"The Application of Genetic Algorithm in The Excavation Process in Road Construction."
Fourth Congress on Computing in Civil Engineering. ASCE, Philadelphia, USA.1996.
Fourth Congress on Computing in Civil Engineering. ASCE, Philadelphia, USA.1996.
5. Naoum, S. and Haidar, A.
"Factors Affecting Site Productivity - A Model And Review."
2nd International Congress on Productivity in Construction, November 1996, National University of Singapore.
2nd International Congress on Productivity in Construction, November 1996, National University of Singapore.
6. Haidar, A. and Naoum, S.
"Optimizing The Selection Of Equipment Using Expert System and Genetic Algorithm."
ASCE Conference on Computing in Civil Engineering, Atlanta, USA, June 1995.
ASCE Conference on Computing in Civil Engineering, Atlanta, USA, June 1995.
7. Haidar, A. and Naoum, S.
"A Hybrid Knowledge Base System and Genetic Algorithms for Equipment Selection"
Journal of Engineering, Construction and Architectural Management, Vol. 7, No. 1, March 2000, PP 3-14.
Journal of Engineering, Construction and Architectural Management, Vol. 7, No. 1, March 2000, PP 3-14.
8. Haidar, A.
"Genetic Algorithms Review and Applications in Construction Management."
The Second International Conference on Decision Making in Urban and Civil Engineering, 6-8 November 2002, London.
The Second International Conference on Decision Making in Urban and Civil Engineering, 6-8 November 2002, London.
9. Haidar, A.
"Critical Path Method Approach and Implementation to Minimise Contracts Disputes."
ICE Conference, Montreal. Canada, 2006.
ICE Conference, Montreal. Canada, 2006.
10. Haidar, A.
"Critical Path Method Approach to Resolve Disputes in Construction Projects."
CME Conference, University of Reading. 2007.
CME Conference, University of Reading. 2007.